IrelandConstruction of an Ultra-Rapid charging facility at Lough Sheever Corporate Park in Mullingar, Ireland.
The brief was to design and build an operational electric vehicle charging infrastructure comprising a total of six standard vehicle bays and four commercial vehicle parking bays comprising of five no. dual head Swarco Raption Compact Chargers
ERA scope consisted of:
- Design and build a brick-built substation to ESBN specifications including installation, termination and commissioning of all Client supplied equipment
- Design and installation of all MV and LV cable routes from LV pillar to chargers, substation to canopy,
- External lighting & CCTV where required
- Design and build on-site customer toilet with disabled access
- Design and installation of EV Canopy
- All associated off site civils