CORE – 20 Ropemaker Street – ICP Delivery

20 Ropemaker is a new 27 storey building in the City of London, providing 447,000 sq ft of offices and 10,000 sq ft of retail. Its stepped design forms a variety of floor sizes from 25,500 sq ft to 7,900 sq ft. 5 terraces of 18,000 sq ft together with south facing balconies providing external amenity and views of the City Cluster.

ReachActive are working collaboratively on all multi-utility services for the future incoming supplies, including the provision of a new ICP HV Power Supply with  6 MVA capacity.

 

 

Skanska plc – K1 Knightsbridge – Multi-utility Diversions

Skanska is building K1 Knightsbridge, a mixed-use scheme for The Olayan Group wtth a project value in the region of £141m. The 31,600sqm project combines commercial, residential and retail space in the Royal Borough of Kensington and Chelsea. The Olayan Group’s developer for the project is Chelsfield.

ReachActive are responsible for all associated utility disconnections and provision of a multi utility diversion strategy to enable demolition and subsequent redevelopment construction works. ReachActive are providing a full design and build solution to our client.

 

 

London Borough of Hammersmith & Fulham – Bechtel House – Multi-utility Diversions

Sheppard Robson’s new £115m building at 245 Hammersmith Road (formerly Bechtel House) will create a prominent architectural addition and sequence of new public spaces in the area’s Business Improvement District (BID).The scheme will provide 22,500m2 of flexible office space and 970m2of retail space.

ReachActive are providing a value-engineered Design and Build solution for the associated multi-utility diversions which will be affected by the project’s Section 278 Public Realm Works.

 

 

Almacantar/Multiplex – Marble Arch Place – HV/LV Power and New Sewer Connections

Marble Arch Place is a new mixed-use development in Marble Arch, London W1. The scheme comprises two buildings – an office building and The Bryanston apartment building. ReachActive previously designed and successfully delivered all associated utility diversions for developer Almacantar to facilitate the redevelopment demolition/construction works.

ReachActive have been re-engaged on the project to provide a design and build solution for the incoming HV and LV power connections. The project scope also includes design and feasibility for the new sewer connections. The location of Marble Arch Place requires our specialist engineering services to deliver the sewer connections at the congested junction of Marble Arch and Edgware Road.

 

 

Stanhope plc – 6-8 Bishopsgate – Section 278 Works

6-8 Bishopsgate Tower is a new 50-storey mixed-use project being developed in the City of London. It will replace the existing 6-8 Bishopsgate and 150 Leadenhall Street buildings and provide 560,000ft² of office, retail, and public space. ReachActive, in joint coordination with the One Leadenhall project (click here), is delivering the Public Realm Section 278 scheme within City of London Corporation boundaries. ReachActive are also providing a design and build solution for multi utility diversions including collaborative works with UKPN delivering the new incoming HV power, improved junction layout and revised traffic signalling infrastructure in collaboration with Transport for London and the City of London Corporation..

 

 

Reuben Brothers – Cambridge House, Piccadilly – ICP Delivery and Multi-utilities

Cambridge House is a Grade I listed townhouse in Mayfair with over 300ft of frontage to Piccadilly, overlooking Green Park. Formerly occupied by a Naval and Military Club “In and Out”. The project scope is comprised of intrusive site investigations to enable a collaborative design and build solution for the re-development including ICP delivery for the incoming HV power as the property is converted to a Hotel and Residence.

British Land – 10 Year Masterplan (100 Liverpool St) – ICP Delivery and Multi-utility Diversions.

Since the successful delivery, in 2012, of the 5 Broadgate project (UBS European Headquarters), ReachActive continues to work with British Land as a key partner in their 10-year Masterplan redevelopment of the Broadgate estate.

Broadgate is the largest asset by value within the British Land portfolio. It is a mixed use campus comprising offices, restaurants, retail and leisure set across four landscaped squares. Covering 32 acres, it is central London’s largest pedestrianised area. Broadgate is adjacent to Liverpool Street Station, a Crossrail station from 2021, and connects the creative, tech-focused communities of Spitalfields, Shoreditch and Old Street with the City.

ReachActive are providing an ICP design and build HV power solution together with multi-utility diversion and disconnections.